Campus Planning and Facilities Management has updated its running list of closures and other activities that affect travel, access and planning on campus.The department broadcasts important campus notifications in a variety of ways to keep the university community informed about building maintenance, emergency management testing, construction and other campus planning and facility projects.
The latest notifications include:
New:
- Wayne Morris Commons at Knight Law Center closed during carpet replacement, July 17-19.
- Campus fire systems testing and maintenance schedule for summer 2023 through Sept. 21: week of July 17 affects Millrace 1, 2 and 3; Susan Campbell Hall; Hendricks Hall; Gerlinger Hall; and Gerlinger Annex.
- Huestis Hall cellular antenna system disruption will affect Verizon and AT&T service in the surrounding areas including Willamette Hall, Carson Hall, Streisinger Hall, University Health Services, Klamath Hall, Deschutes Hall and Lewis Integrative Science Building, July 17-31.
- McKenzie Hall electrical panel work will affect rooms 101, 101A, 201, 214, 215, 221, L300 and 471-476, July 20.
- Huestis Hall basement AHU1 and 2 shut down for cleaning and maintenance, July 24.
- Lot 2 (east of the steam plant) irrigation leak repair advisory, July 25.
- Onyx Bridge second floor HVAC air supply shut down for repair work and maintenance, July 25-27.
- Berwick Hall AHU-1 shut down and awaiting parts, through July 26.
- Riverfront Parkway north and south bound lanes closed during crane install, July 28-29.
- Cascade Hall heat exchanger offline for repairs, Aug. 1-3.
- Thirteenth Avenue Garage elevators will alternate being offline during load testing, Aug. 7.
- Prince Lucien Campbell Hall elevators will alternate being offline during load testing, Aug. 8.
- Erb Memorial Union freight elevator will be offline during load testing, Aug. 9.
- Chapman Hall elevator will be offline in the afternoon during load testing, Aug. 9.
- Baker Downtown Center passenger elevator will be offline in the morning during load testing, Aug. 10.
- Global Scholars Hall steam shutdown to replace meter and make upgrades, Aug. 28-30.
- Klamath Hall emergency shutdown of 60-pound steam due to a leak, timeline unknown.
Updated:
Ongoing:
- Lawrence Hall wheelchair lift replacement advisory, July 18-Aug. 11.
- Riverfront Parkway southbound lane closure to install crane base, July 19.
- Fenton Hall sprinkler system shut down for alterations, July 20.
- Chapman Hall light construction and second floor restroom closure advisory, through July 21.
- Knight Library second floor new furniture installation, July 24-Aug. 8.
- University Health Services roof leak investigation and repair advisory, through Aug. 2.
- Knight Law third floor carpet replacement advisory, through Aug. 4.
- Heritage Renovation Project informational bulletin, through Aug. 7.
- McKenzie Hall carpet replacement and access advisory on third floor, Aug. 1-31.
- Fenton Hall Room 314 construction work advisory, through Aug. 31.
- Campuswide summer lowered custodial services, through Sept 4.
- Parking Lot 12B (north of Streisinger) closed during East Science Loop Electrical Project, through Sept. 12.
- Knight Library Consolidated Testing Center Renovation, through Sept. 15.
- Streisinger Hall and Parking Lot 12B East Science Loop Project groundwork, through Sept. 30.
- Campus air handling unit preventative maintenance scheduled for July 2023 affects Thompson University Center, Prince Lucien Campbell Hall, Condon Hall, EC Cares Main office plus EC Whiteaker and EC Westmoreland modules.
- Gallery Way road closed by Millrace Studios for construction of utility tunnel, through Dec. 15.
- Hamilton/Walton Residence Hall Transformation Project phase 2 July 6, 2021-Aug. 1, 2023.
- Huestis Renovation Project Site Logistics for next phase March 31, 2022-Dec. 31, 2023.
- Knight Campus phase 2 project access advisory for north ampus Dec. 12, 2022-Aug. 29, 2025.
- Education Annex emergency cold water shut down due to underground water pipe leak, timeline unknown.
- Lawrence Hall wheelchair lift (E271) shut down for repairs, timeline unknown.
- Frohnmayer Music heating system repair, timeline unknown.
- Gerlinger Annex first floor steam heat shut down due to leak, timeline unknown.
- Baker Downtown Center restrooms 201A and 202A shut down until city of Eugene repairs sewer line, timeline unknown.
- Klamath Hall house vacuum down, timeline unknown.
- University Health Services basement emergency shut down of AHU-1, timeline unknown.
- Johnson Hall portico scaffolding advisory, work is complete except for new globe installation, timeline unknown.
- Tykeson Hall elevator working intermittently until part arrives, timeline unknown.
- CPFM Back Forty thermal tank storage project advisory, timeline unknown.
- Lillis HVAC AHU-1 emergency shut down to make repairs, timeline unknown.
- Klamath Hall vacuum pump offline after power outage, timeline unknown.
- Frohnmayer Music east elevator offline, timeline unknown.
- Chapman Hall basement women's restroom sink water shut down until parts arrive, timeline unknown.
- Campus AMAG academic break and holiday door locks advisory for 2022-23.
Employees can stayed informed by visiting the UO map construction and impacts or the campus closures, shutdowns and detours website.