Campus Planning and Facilities Management has updated its running list of closures and other activities that affect travel, access and planning on campus.
Employees can stayed informed by visiting the campus closures, shutdowns and detours website or by checking the UO campus map construction impacts.
The latest notifications include:
- Campuswide summer building access advisory for manually locked and unlocked (non-card access) exterior doors, through Sept. 23.
- Frohnmayer Music Courtyard pressure-washing advisory, through June 26.
- Lokey Education, Frohnmayer Music, HEDCO Education, Miller Theatre, Berwick Hall and possibly Lawrence Hall elevators shut down for rupture valve testing, through June 27.
- Huestis Hall rooms 200A-B, 224A-B, 300A-B and 321A-B heat offline during controller device installations, June 27-28.
- Huestis Hall third floor restrooms will be closed to work on restroom fixtures, June 28.
- Huestis Hall lab vacuum pump system shut down during installation of a new fabricated muffler section, June 28.
- Campuswide island mode testing planned for Aug. 7.