Campus Planning and Facilities Management has updated its running list of closures and other activities that affect travel, access and planning on campus.
Employees can stayed informed by visiting the campus closures, shutdowns and detours website or by checking the UO campus map construction impacts.
The latest notifications include:
New:
- Portland Gymnasium closed while power is offline during electrical panel replacements, through Jan. 15.
- 1776 Millrace exterior window cleaning, through Jan. 16.
- Lewis Integrative Science Building Room 012B concrete drilling to produce loud noise, Jan. 13.
- Villard Hall hallways and common spaces may be without heat during heating water valve replacement, Jan. 19.
- 1776 Millrace elevator maintenance will be performed on one elevator at a time, Jan 21-22.
- Willamette Hall chilled water shut down during work on the system, Jan. 22.
Updated:
