Campus Planning and Facilities Management has updated its running list of closures and other activities that affect travel, access and planning on campus.
Employees can stay informed by visiting the campus closures, shutdowns and detours website or by checking the UO campus map construction impacts.
The latest notifications include:
New:
- Gerlinger Hall classrooms 242, 246, 248 and 303 carpet installation, through July 16.
- Lokey Education (wings A and B) exterior window cleaning, through July 17.
- Lokey Education (wing C) exterior window cleaning, through July 17.
- Campuswide summer parking lot restriping closes specific lots the weekends of July 11-12 and July 18-19.
- Berwick Hall exterior window cleaning, through July 17.
- Frohnmayer Music exterior window cleaning, through July 22.
- Cascade Hall emergency elevator shutdown to repair leak, July 14.
- Knight Campus skybridge between buildings 1 and 2 closed during door modifications, July 20-31.
- Parking Lot 9 (south of Villard Hall) closed during crane activity, July 20-31.
- Klamath Hall steam and hot water offline during work on steam pipes, July 27-31.
Updated: